General engineering · Chico, CA

Drainage, drainage, drainage.Then rock. Then asphalt.

An old superintendent answered every question about roads that way, and he was right: water is what takes a road apart, and everything above the ditch line is just the part you can see. North State Construction grades sites, builds and paves roads, puts in the water, sewer, and storm drain under them, and runs the trucks that feed all three.

(530) 555-0142CSLB Class A General Engineering · license pending, expected June
Typical structural section · drawn to scale
FINISHED GRADE · 2% CROSS SLOPE3Asphalt concrete8Class 2 aggregate base12Compacted subgrade23″ totalNATIVE GROUND

A public street a city will accept for maintenance. Built to the standard plan, inspected at every lift.

Typical R-value design for a residential street. The soils report sets the real numbers.

Feeds it8″ of base over 1,000 sq ft is about 48 tons, or 2 transfer loads. Our trucks, our rock.

Schedule of work

Eight divisions, priced the way they are measured

A general engineering licence covers fixed works: roads, earthwork, pipe, drainage, and the structures that hold them together. These are the eight we self-perform, with the unit each one is actually bid in.

CY is cubic yards, LF is linear feet, SF is square feet, LS is a lump sum. If your invitation to bid is written in those units, we can price it without a phone call.
Division 04 · Trucking

The trucks are ours

On a dirt job the haul is usually the biggest single line in the bid. When the trucks belong to somebody else, that line carries a broker's margin and a dispatcher who has never seen your site. Ours do not.

Transfers, end dumps, belly dumps, ten-wheelers, water trucks, and lowbeds, running out of the Chico yard. We deliver base rock, drain rock, sand, and topsoil by the ton, haul spoils and demolition debris off, and move equipment for other contractors when they need a truck for a week rather than a year.

Six truck types

The right one for the access. A transfer needs room to set the trailer down; a ten-wheeler fits a driveway.

Ton or hour

Aggregate delivered per ton with the scale ticket. Spoils and equipment moves hourly, portal to portal.

Water trucks

Two and four thousand gallon, for dust control, moisture conditioning, and the fire watch clause in your contract.

Dates we can hold

Dispatch is in the same building as the estimator, so the start date in the bid is the start date on the calendar.

Takeoff
How many loads is that?
In place
59.3
CY
Order, loose
74.1
CY
Weight
111
tons
Loads, by truck
10-wheel dumpTight sites, driveways, short hauls10 CY8loads
End dumpSpoils and demolition debris18 CY5loads
TransferThe valley workhorse for base rock22 CY4loads
Belly dumpWindrowing base along a road on the move24 CY4loads

Planning numbers, not a quote. Weights move with the pit and the moisture. Rock and soil you buy are figured loose, because base shrinks about a quarter when it is rolled and the finished thickness is what you measured; material you dig is figured with swell, because a hole never gives back the yards it measured. Tell us the job and we will price it by the ton or by the hour.

Sequence

How a site goes in, bottom to top

Sitework is four or five trades stacked in a fixed order, and every one of them buries the one below it. Read this the way the work happens: from the ground up.

Taking the whole stack under one contract removes the handoffs between trades, which is where most sitework schedules actually lose their time.
8

Final grade, striping, and the punch list

Shoulders dressed, landscape areas brought to grade, striping and signage in, as-builts submitted, and the walk with the inspector.

7

Paving

Asphalt at the mix and lift thickness the spec calls for, laid at temperature and rolled to density before the mat cools, with the longitudinal joint given its own rolling pattern.

6

Aggregate base

Rock in lifts, watered, rolled, and trimmed to grade. This is the structural layer. A half inch short here is a thin mat and a short pavement life.

5

Joint trench and structures

Conduit and boxes for the dry utilities, then manholes, inlets, curb, gutter, sidewalk, and ADA ramps to the agency standard detail.

4

Wet utilities

Sewer, water, and storm drain, deepest first. Bedding, pipe, shading, and backfill in compacted lifts, because the trench is the part of a street that fails first.

3

Rough grade

Cut and fill balanced on site, fills placed in lifts and compacted, subgrade shaped to the design surface with GPS machine control.

2

Demolition and clearing

Existing pavement, structures, and vegetation out. Concrete and asphalt crushed on site where the spec allows recycled base, which deletes two truck movements per yard.

1

Erosion control, before anything is stripped

Silt fence, inlet protection, and a stabilized entrance go in first. Installing them after the site is open costs twice as much and works half as well.

Ground level · start here, read up
Equipment

What shows up on the job

Every division needs a particular set of machines, and the quickest way to lose a week is to bring the wrong size. This is the equipment the work runs on, listed by class rather than by count, because what matters to you is whether it fits your access and your spec.

A single drum vibratory roller parked on a gravel pad
Single drum vibratory roller
Earthmoving
Excavators5.5–36 tSized to the access, with thumbs and grade control
DozersD4–D6GPS blades for finish grade
Motor graders140-class3D machine control off the design surface
ScrapersPull typeLand leveling and long on-site hauls
LoadersWheel and skid steerLoading trucks and moving material
Compaction and paving
Smooth drum rollers84 in to walk-behindBase and asphalt, down to a trench patch
Rubber tire rollerNine wheelSealing the mat behind the breakdown pass
Sheepsfoot compactorsPadfoot drumThe only thing that compacts a clay lift
Asphalt paver8–15 ft screedTracked, for streets and lots
Cold planerHalf laneGrind and overlay, digouts, and butt joints
Trucks
Transfers22 CYThe valley standard for base rock
End dumps18 CYSpoils, and anything wet or sticky
Belly dumps24 CYWindrowing base along a road on the move
10-wheel dumps10 CYDriveways and tight access
Water trucks2,000–4,000 galDust control and moisture conditioning
LowbedsTo 55 tonMoving the machines above
Support
Trench shoringTo 20 ftBoxes and hydraulic shores
Survey and grade controlGPSRovers, base station, machine control, as-builts
Traffic controlPer planSigns, plates, flaggers, and detour phasing
Light plants and generatorsNight workFor closures that have to happen after hours
Equipment is matched to the job at bid time and staged on site for the duration, so what is parked at your project is what that project actually calls for. Anything specialized comes in with an operator who runs it every day.
Gallery

The work, roughly

Placeholder photography until this company has its own. Every caption says what the photo actually shows rather than claiming it as our job.

Photos are stand-ins until our own job photos are up: public domain images from the U.S. Army Corps of Engineers and the National Park Service, plus freely licensed photos from Wikimedia Commons (CC0 and CC BY-SA 4.0).

Clients

Who we work for

Four of these five have a bid process and a compliance package. We are set up for all of them.

Public works

Cities, counties, Caltrans, school and special districts

Hard-bid and CUPCCAA work: road rehabilitation, storm drain, ADA ramp packages, parking lots, and basins. Certified payroll, prevailing wage, and the daily reports an inspector expects.

Send the bid package

Private development

Developers, builders, general contractors

Subdivision and commercial sitework from the demo through final grade. We hold our own schedule and we do not disappear when the paving subcontractor does.

Request a proposal

Agriculture

Growers, ranches, packing and hulling operations

Land leveling, ag roads, ponds and tailwater returns, orchard removal, and yard rock. Work that has to happen between harvest and the first rain, and we plan around that calendar.

Talk to us before harvest

Utilities and energy

Water districts, irrigation districts, utility contractors

Pipeline trench, pump station sitework, access roads to towers and pads, and pole line grading. Traffic control and encroachment permits included in the number.

Ask about a package

Emergency and recovery

Agencies, insurers, and property owners after fire and storm

Debris removal, road reopening, culvert replacement, and slope stabilization. The North State knows what a wet January after a burn scar does to a road, and so do we.

Call the yard

What comes with the bid

Licence
Class A General Engineering
Public works
DIR registered, certified payroll
Grade control
3D machine control and as-builts
Trucking
Our own trucks and drivers
Schedule
Weekly look-ahead, one superintendent

Licence, DIR registration, bond capacity, insurance certificates, safety program, and a project reference list go out with any prequalification package. Ask and it is sent the same day.

About

Built around the valley calendar

Dirt work in the Sacramento Valley has a season, and pretending otherwise is how schedules fall apart. Heavy valley clay will only take compaction in a narrow moisture window; too wet in February, too dry and hard in August without a water truck on it. Asphalt plants run April to November. The wet season starts October 1 whether the erosion control is in or not.

We plan around that calendar rather than discovering it. Grading and paving get scheduled into the dry months, underground and rock work fill the winter, and erosion control goes in during September on a dry site, by a crew that is not also trying to finish the paving.

The other thing that shapes work here is water. Every road failure has water in it somewhere, and in this valley there is a levee, a canal, a ditch, or a burn-scar watershed near most of what we build. Drainage is not a line item we add at the end.

Rock slope protection placed along a valley channel bank with a gravel maintenance road above it
Rock slope protection along a valley channel
Questions

What people ask before they call

A Class A General Engineering licence covers fixed works that need engineering knowledge: roads, highways, streets, excavation and grading, sewers and storm drain, water systems, pipelines, drainage and flood control, bridges and culverts, parking lots, and land leveling. It is the licence a public agency looks for on a road or underground job, where a B general building licence is not enough.
Yes. Send the invitation to bid with the plans, the specifications, and the bid date and we will confirm receipt the same day. We carry the bond capacity for the size of work we chase, and we will tell you plainly when a job is bigger than we should be taking.
There is no published minimum, but mobilizing a machine and a lowbed costs the same whether it works one day or ten. A driveway, a pad, a culvert, or a load of rock is worth a call. If the job is genuinely too small to be worth our mobilization, we will say so and point you to someone closer to it.
Yes. Trucking is its own division. We deliver base rock, drain rock, sand, and topsoil by the ton, haul spoils and demolition debris off, run water trucks for dust control, and move equipment on our lowbeds. Hourly and per-ton both.
Butte, Glenn, Tehama, Colusa, Shasta, Sutter, and Yuba counties without a second thought, and past that when the job justifies moving a crew. Distance is a mobilization line on the bid, not a refusal.
Yes. We are registered with the California Department of Industrial Relations, we file certified payroll through the state system, and our foremen are used to working under an inspector and a labor compliance program.
Whatever the work calls for, sized to it: excavators that fit the access, a blade with machine control where the grade has a tolerance, the right roller for the material, and the trucks to feed them. The equipment list on the homepage is by class rather than by count, because the number of machines in a yard tells you nothing and the size of the one that shows up tells you everything.
Dirt work stops when the ground will not compact, and that is written into the schedule from the start rather than discovered in February. Erosion control goes in before the season, not after the first notice, and we winterize open trench and exposed slopes when the forecast turns.
Service area

Seven counties, one yard

The yard is in Chico and the crews work out of it. Mobilization is a line on the bid rather than a reason to say no, so if your job is past the edge of this list, ask.

Not on the list? Every town we work in
Get a number

Tell us what the job is

Scope, rough quantities, the town, and when the site is available. If there is a bid date on it, put the date and time in and we will confirm receipt the same day.

Where we work
Butte, Glenn, Tehama, Colusa, Shasta, Sutter, and Yuba counties
Yard at 4180 Midway, Chico, CA 95928

CSLB Class A General Engineering · license pending, expected June

Goes to the estimator and nobody else. Plan sets over email or a link to your plan room.

You found a concept site

This site is a design concept by Rune, built to show what a website for North State Construction could look like. It is not the official website of North State Construction, and it has not been commissioned or endorsed by them.

North State Construction is a placeholder business built to show what this site can do. The phone number is a reserved fictional number and does not ring anywhere. Messages sent through the form go to Rune.

Is this your business?

This was built for you as free spec work, no strings attached. Want changes, the keys, or the whole thing taken down? One email does it, usually same day.

Email hello@rune.design